The site record that stands up when someone disputes it.

In construction, disputes don’t go to the side with the best lawyers. They go to the side with the best records. ClarusPM makes sure that side is you — for contractors and subcontractors on site.

If it isn’t written down on the day, it didn’t happen.

The permit was opened. The gang was briefed. The instruction was given at 08:15. The extra was photographed before it was covered up.

That chain exists in ClarusPM. On WhatsApp it does not.

From £9/month · 14-day free trial · No card needed · On a tablet on site and on the office computer · The morning briefing saves and sends when signal returns · Supports your CDM obligations

09:14 · ●●●●○
Tuesday’s job
Extension · Newport
3 on site
Briefing saved — sends when signal returns
PM Dashboard · Wk 12
Extra logged 08:15 — photo attachedClient asked for a wider opening — recorded before work started
Programme
73%
Wk 12/18
Output
47/65
On target
Extras
4
this week
Programme
FoundationsOn track
Blockwork−3 days
RoofUpcoming
Instructions
SI-001Move door openingSigned
SI-002Upgrade insulationPriced
SI-003Verbal — siteConfirm ⚠
£9
Starting price per month
5
Role-based access levels
14
Day free trial no card needed

In construction, the side with better records wins

Every level of contractor faces disputes. The difference between winning and losing is almost always the same — who kept the better record.

Sole trader
“The customer says they never asked for that extra.”
You have a date-stamped note, a photo, and a voice record from the moment they asked. Logged on site, that morning.
Subcontractor
“The main contractor says the extra work was never instructed.”
You have a dated log of every instruction received and the drawing revision that was live when you did the work.
Main contractor
“The employer says the CE notification was out of time.”
You have the clause 61.3 notification clock running from when you became aware of the event, using the period in your contract, and the notification sent within the window, timestamped.
Main contractor, at final account
“The client disputes the final account 18 months later.”
You have every daily report, CE, Hold Point sign-off, and application — searchable, exportable, and ready in hours.

Protection at every level

From your first job to your biggest contract

Sole trader
Starter
Proof the work was done
£9/month · 1 project
Subcontractor
Professional
Records that protect you
£39/month · up to 5 projects
Growing civils & groundworks firm
Business
Audit trail for every instruction
£79/month · up to 15 projects
Main contractor
Main Contractor
Every deadline met, every dispute defended
£120/month · unlimited projects
Who it’s for

Four types of contractor. One platform. The same protection.

Whichever one you are, the risk is the same shape — a missing record, a missed deadline, a claim you cannot defend.

🔨
Sole trader & day rate

On the tools

“The customer says they never asked for that extra. I have nothing in writing.”

✓Log an extra in one tap — date-stamped immediately
✓Photo before it’s covered up — time and location embedded
✓Crew sign with a finger on screen every morning
✓End-of-day summary sent to the customer
✓The morning briefing saves and sends when signal returns

When the customer disputes it — you have a dated record, a photo, and a voice note from the moment they asked.

Starter · £9/month · 1 projectStart free →
🚚
SME subcontractor

Working under a main contractor

“The main contractor keeps changing things and expects us to absorb the cost. They say we agreed verbally.”

✓Every instruction logged the same day
✓Drawing register — which revision was live when you did the work
✓RAMS briefings with operative sign-on
✓Daily site record of who was there
✓Application for payment with retention tracked

When the main contractor says it never happened — you have proof it did.

Professional · £39/month · up to 5 projectsStart free trial →
🏗
Growing civils & groundworks firm

Running the contract

“The client says we never told them about the delay. We know we did. But we can’t prove when.”

✓Instructions, extras and delays logged on the day, with photos
✓Daily reports locked when the shift ends — your evidence if a dispute arises
✓ITP Hold Points — nothing proceeds without PM sign-off
✓Retention tracker with 40-day advance alerts
✓PM dashboard live from site — and on NEC4, the CE register with its notification clock

When the client disputes the timeline — the dated, locked site record is in ClarusPM.

Business · £79/month · up to 15 projectsStart 14-day trial →
🏢
Main contractor

Portfolio-scale protection

“The client is disputing the final account. Our records are across 17 different systems and nobody can find anything.”

✓Every daily report, CE, and Hold Point — one platform
✓Portfolio dashboard — all projects, all risks
✓Full project export — ready for your QS or solicitor at any point
✓Unlimited projects and users
✓Dedicated onboarding for your team

When the client disputes month 18 — the full project record is searchable and exportable in hours, not weeks.

Main Contractor · £120/month · unlimited projectsTalk to us →
✦ AI-powered

Upload your contract. We read it.

Drop in your contract (NEC4, JCT or your own terms) and programme at project setup. ClarusPM reads them with AI and fills in the project details, activities, and planned dates automatically.

✓Contract type, parties, value, and dates extracted
✓Programme activities and planned dates imported in seconds
✓Mark your contract as confidential — Directors only
✓Skip if you don’t have the documents to hand
ⓘ AI assists — you decide. Every extracted field is shown to you for review and confirmation before anything is saved. You check it, you confirm it, then it goes in.
📄
Drop your contract here
NEC4, JCT, or any contract document
PDF · DOCX
— or —
📅
Drop your programme here
Excel or PDF programme
PDF · XLSX · XLS
I don’t have them right now — enter details manually →
What’s at stake

The cost of not having a clear record

One disputed extra can wipe out the margin on a job.

Instructions are given on site, in a hurry, out loud. Weeks later, nobody agrees what was said.

The site record settles it.

🚧

The extra nobody signed for

The work is done, covered up and invoiced. Then the customer says they never asked for it, and there is no photo and no note.

📄

The instruction was verbal and now nobody agrees

Site instruction given 01/10/2026 at 08:15 — no record kept. Three weeks later, both sides remember it differently.

💷

Retention sitting with the client

Long after the release date has passed. Completion certified, Defects Certificate issued, and still nobody has chased it.

🔒

Work proceeds past a Hold Point without sign-off

ITP Hold Points unresolved, work continuing anyway. The PM does not know until it is too late.

The tools that protect you

Every feature is a layer of protection

Not modules you have to learn. Tools that run in the background, building the record you need before you know you need it.

☀️

Start today

Tap once to open the day. Weather, who’s on site, what plant is running. Done in 60 seconds.

Proves the site was active and who was there

Simple Works
📷

Add a photo

One tap, camera opens. Time, date, job stamped automatically.

Date-stamped evidence from the moment it matters

Simple Works
➕

Note an extra

Log it immediately — typed or voice — while they are still standing there.

Proof the extra was requested, dated to the minute

Simple Works
👷

Crew sign-on

Sign with a finger on screen. 30 seconds for six lads. CSCS cards stored once.

Operative attendance proven if CDM is questioned

Simple Works
🎤

Voice notes

Hands in gloves, raining, can’t type. Tap mic, say what happened.

Verbal instructions captured before they become “never happened”

Simple Works
📧

Send the day

End-of-day summary sent to customer and office.

Your record and theirs. Agreed before the dispute starts.

Simple Works
🔒

Retention tracker

40-day advance alerts, one-tap draft application, phased release schedule.

Your money released on time, every time

NEC4/JCT
📊

PM dashboard

Live from site — weather, output, plant, CE flags, all in one screen.

The PM sees what happens on site as it happens

Main contract
✅

ITP with Hold Points

PM signs off before work proceeds. Every approval timestamped and linked to QA.

Impossible to proceed without the record

NEC4/CDM
📑

Drawing register

Automatic revision extraction and history, with which revision was live on that date.

Proves you built to the current revision

All contracts
🧪

Concrete QA

Cube test results, mix designs, delivery tickets against BS 8500.

Lab records proving spec was met years later

BS 8500
🛡️

RAMS library

Revision-controlled RAMS with briefing sign-on, CDM 2015 compliant.

Proves every operative was briefed on the risk

CDM 2015
💧

Pressure test records

Air and water test results logged against BS EN 1610.

Signed test record defending you after handover

BS EN 1610
🏗️

Plant register

On-hire register, reception checks, fit-for-purpose assessment.

Proves plant was checked and fit on the day

Site operations
🔍

Pre-pour inspection

Sign-off workflow before any concrete is placed.

Nothing poured without the record

Quality assurance
📋

Pile integrity test

Test records logged and linked to the pile reference.

Full pile record if integrity is ever questioned

CIRIA C569
ClarusDocs

Start with a document. Manage it here.

ClarusDocs gives you the RAMS and permits. ClarusPM is where they get briefed, signed, and stored — with every operative’s signature locked to a timestamp.

Browse ClarusDocs documents →
NEC4

On NEC4? The compensation event clock is built in.

The notification clock under clause 61.3: eight weeks under the main contract, often far shorter in a subcontract. ClarusPM counts the periods in your contract, not the textbook. ClarusPM was built by NEC4 practitioners: all 21 compensation event types, the clause 61.3 countdown, quotations, early warnings and payment certification are wired in. One unnotified compensation event costs more than years of subscription.

Cl.60.1
Compensation events — all 21 sub-clauses available as CE type. Auto-linked to site records, drawing revisions, and site instructions.
Cl.61.3
Notification date — every CE not yet notified shows “Notify by [date]: days left”, counted with the notification period you confirm for your contract. Once notified, it shows the date you notified.
Cl.62.3
Quotation submission — tracked from the instruction to quote, using the period in your contract.
Cl.51.1
Payment dates — for every application: assessment, due date, payment notice, pay-less notice and final date, using your contract’s periods, with a prompt if a payment notice is missed.
Cl.15
Early warnings — EWN register with risk type, potential time and cost impact, meeting records, and mitigation actions.
CDM 2015
H&S records — RAMS briefings with operative sign-on, permits to work, toolbox talk records. Kept for at least 7 years, and you can ask for an export at any time.
Live dashboard alerts — this morning, 29/09/2026
CE-003 — notify by 2 Oct 2026: 3 days leftGroundwater — unexpected level. Cl.60.1(12). Diary entry and photos linked.
Hold Point HP-07 — outstandingPile integrity test results not approved. Site cannot proceed to cap.
Application 3 — payment notice overduePayment notice deadline passed 2 days ago: serve a default payment notice?
Retention release — 40 daysDefects Certificate due. £12,500 release due. Draft application now.
Built for the whole team

Five roles — one clear picture

Every user sees exactly what their role needs. The site manager sees the site. The estimator sees the money. The PM sees everything — in real time.

Director

Full access — all projects, all financial data, all modules.

Full access

Project Manager

Dashboard, CE management, ITP approvals, RAMS, permits, programme.

Operational lead

Estimator

Commercial module only — CE values, applications, retention, BOQ.

Commercial only

Engineer

QA register, drawings, ITP, plant checks, daily reports. No financials.

Technical site

Site Manager

Daily reports, voice notes, RAMS, toolbox talks, plant, operatives.

Site operations
Pricing

Priced by active project

Pay for the projects you are running, not per seat. Everyone working on a project — site managers, engineers, the PM — is included. 14-day free trial, no card needed.

Starter
£9/mo
One job at a time. A permanent record of every day on site.
✓1 active project
✓Unlimited users on that project
✓All site manager features
✓RAMS library
Start free trial
Business
£79/mo
Growing civils and groundworks firms running up to 15 projects.
✓Up to 15 active projects
✓Unlimited users
✓All features
✓Director dashboard
Start free trial
Main Contractor
£120/mo
Main contractors running many projects at once.
✓Unlimited projects
✓Unlimited users
✓All features
✓Dedicated onboarding
Start free trial

Not replacing CEMAR or whatever system your client runs.

The client or main contractor has the system. You have a WhatsApp message and a diary no one can find in month eighteen.

ClarusPM is the subcontractor’s own record of the event — with the timestamp, the photo, and the signed permit attached. Export the signed briefing or permit to PDF and submit it through whichever system the contract uses.

“We built ClarusPM because construction teams deserve a clear view of what is happening on their projects — not a spreadsheet, not a WhatsApp group, not an enterprise platform. One screen. The same picture for everyone. And when you need to prove what happened, the record is already there.”

Darren Wells — Founder, ClarusPM

Get real protection

for your project, your contract, your money

14-day free trial. No setup fee. No credit card. Your first project is live — and protected — in under 10 minutes.